Green Mountain, Romford

Walkway & Staircase Heating
Aerial view of a large industrial warehouse surrounded by residential houses with green fields and trees in the background.
Overview

Keeping data centre access routes ice-free

A Raychem surface heating system installed across the external staircases, walkways and access routes of a new data centre, protecting them against frost and ice and keeping pedestrian access safe through winter.
The external access areas were exposed to cold weather and at risk of ice forming through the winter months. The system was selected to keep staircases, walkways and access routes clear, supporting safe access and the continued operation of the facility during freezing conditions.
Delivered within a fast-paced construction programme, the works were coordinated alongside the wider mechanical, electrical and building services installation. Close coordination with the M&E teams kept the heating cable and controls on schedule without affecting other trades. The system runs across multiple independently controlled circuits, with temperature and moisture sensing controls that trigger operation automatically when conditions require it. Particular care went into cable positioning to give consistent heat across the designated areas. Every circuit was inspected, tested, and commissioned before handover, with as-installed drawings and full documentation provided. The completed system responds automatically to cold, wet conditions, preventing ice on the staircases and walkways, reducing the risk of slips, and helping maintain safe access to critical areas of the facility.
Client
Green Mountain
Services
Walkway & Staircase Heating
Location
Romford, Essex
Duration
2 months
Walkway & Staircase Heating
Maintaining safe, slip-free access in all conditions