Bristol Airport Energy Centre
Frost Protection
Overview
Frost Protection of new Energy Centre at Bristol Airport
A comprehensive Raychem Frost Protection system installed at Bristol Airport’s new Energy Centre, providing reliable frost protection to external pipework and associated services.
As part of the development of the Bristol Airport New Energy Centre, this project involved the provision of frost protection to selected external chilled water (CHW) services and associated plant equipment.
The installation was designed to protect exposed pipework and connections against freezing during periods of low ambient temperatures, helping maintain the integrity and reliable operation of the chilled water system.
XL Trace
Raychem
1200m+
Heating cable
4 Week
Programme
9
Independent Circuits
Frost Protection
Prevent damage, maintain operational reliability and minimise disruption caused by freezing conditions.