Bristol Airport Energy Centre

Frost Protection
Overview

Frost Protection of new Energy Centre at Bristol Airport

A comprehensive Raychem Frost Protection system installed at Bristol Airport’s new Energy Centre, providing reliable frost protection to external pipework and associated services.
As part of the development of the Bristol Airport New Energy Centre, this project involved the provision of frost protection to selected external chilled water (CHW) services and associated plant equipment. The installation was designed to protect exposed pipework and connections against freezing during periods of low ambient temperatures, helping maintain the integrity and reliable operation of the chilled water system.
XL Trace
Raychem
1200m+
Heating cable
4 Week
Programme
9
Independent Circuits
Client
Bristol Airport
Services
Frost Protection
Location
Bristol
Duration
4 Weeks
Frost Protection
Prevent damage, maintain operational reliability and minimise disruption caused by freezing conditions.